Seven takeoff mistakes that lose bids, or win the wrong ones
Most bad numbers come from the same handful of errors. Here is where to look before you sign a bid.
A takeoff that is too high loses the job. One that is too low wins it, which is worse. These are the errors behind most of both.
1. The wrong scale
A sheet printed to fit, a detail at a different scale from the plan, a PDF that was scanned and resized. Measuring at the wrong scale puts every quantity on the sheet out by the same factor, and nothing looks wrong on screen. Check each sheet against a written dimension before measuring anything on it.
2. Missing an addendum
Addenda change quantities, add scope and replace sheets. A takeoff from the original set prices a building nobody is going to build. List the drawing dates and addenda numbers on the takeoff, so anyone can see what it was based on.
3. Measuring plan length for things that go up
Pipe and conduit have risers and drops. Walls have heights that change by wall type, and some run to the deck above the ceiling. A takeoff that measures only what the plan shows flat will be short every time.
4. Forgetting what the drawings do not draw
Blocking, backing, fasteners, sealant, primer, hangers, sleeves, firestopping. None of it is drawn, all of it is bought. These come from the specification and the details, and from knowing how the trade builds.
5. Gaps and overlaps between trades
Who carries the wall base, the flooring installer or the carpenter? Who insulates the ductwork? Who patches the fireproofing? Every boundary between trades is a place where an item is counted twice or not at all. On a full-scope estimate, each of these should appear once, in a known place.
6. Deducting, or not deducting, openings
Trades have different conventions. Some deduct every door and window from wall area, some only the large ones, some none, on the basis that working around an opening costs as much as covering it. None of these is wrong. Mixing them without saying so is.
7. Trusting the schedule without checking the plan
A door schedule lists 34 doors. The plans show 36. Schedules and plans are drawn by different people at different times, and they disagree more often than anyone would like. Count from the plans, compare with the schedule, and raise the differences as questions before bid day.
The common thread
Every one of these is caught by the same habit: being able to trace each quantity back to where it was measured. A takeoff with marked-up drawings can be checked by a second person in a fraction of the time it took to produce. One without them has to be taken on trust.