Structural and miscellaneous steel takeoffs
Every beam, column, joist and stair listed by member size and length, then totalled by weight, so your shop and your erector are pricing the same tonnage.
Nothing to send yet? Ask a question or request a sample.
Division 05Structural and misc. steel takeoff schedule
| Beams and girders by size | LF / TON |
|---|---|
| Columns and base plates | EA / TON |
| Joists and joist girders | EA / LF |
| Metal deck | SF |
| Stairs, rails and ladders | EA / LF |
| Lintels, angles and embeds | LF / LB |
- Fee and delivery date
- Confirmed before work starts
- Typical delivery
- 24 to 48 hours
- You receive
- Editable Excel estimate and drawing markups
- Priced from
- Cost data for your zip code
- Minor revisions
- No charge
Sheet 2 of 7
What we take off for structural and misc. steel
Quantities are grouped the way the trade prices its work, so each group can be checked and priced on its own.
Structural framing
Wide-flange beams, girders and columns listed by size, length and weight, with base and cap plates.
Joists and deck
Open-web joists and joist girders by designation, bridging, and roof and floor deck by gauge and profile.
Connections
An allowance for connection material as a percentage of member weight, or counted plates and bolts where the details show them.
Stairs and railings
Stair flights, landings, guardrails and handrails measured from the stair details.
Miscellaneous metals
Loose lintels, shelf angles, embeds, bollards, ladders, gratings and supports.
Finish
Shop primer, galvanizing and field touch-up, where specified, shown against the tonnage it applies to.
Sheet 3 of 7
What the estimate looks like
A few lines from a two-storey steel-framed office, laid out the way your spreadsheet arrives: CSI code, description, measured quantity, unit cost and total.
| CSI code | Description | Quantity | Unit | Unit cost | Total |
|---|---|---|---|---|---|
| 05 12 00 | Structural steel framing, beams and columns, erected | 86 | TON | 5,200.00 | 447,200 |
| 05 21 00 | Open-web steel joists, K-series | 18 | TON | 4,350.00 | 78,300 |
| 05 31 00 | Steel roof deck, 1-1/2" type B, 22 gauge | 14,500 | SF | 4.10 | 59,450 |
| 05 31 00 | Composite floor deck, 2", 20 gauge | 13,800 | SF | 4.85 | 66,930 |
| 05 51 00 | Metal pan stair with landing, per flight | 4 | EA | 11,800.00 | 47,200 |
| 05 52 00 | Steel pipe guardrail, 42" high | 310 | LF | 135.00 | 41,850 |
| Direct cost, these lines | $740,930 | ||||
Illustrative figures for a sample project, not a quote. Your estimate uses your drawings, your location and your markups. See a full sample estimate linked to its plan.
Sheet 4 of 7
What to send, and what comes back
Send us
- Structural drawings: framing plans, column schedule, sections and details
- Architectural drawings, for stairs, rails and miscellaneous metals
- The structural steel and metal fabrications specification sections
Missing some of these? Send what you have and we tell you what the gaps mean for the estimate.
You get back
- An editable Excel file, in our template or yours
- Every quantity with its CSI code and unit
- The drawings marked up to show what was measured
- Minor revisions at no charge
Most estimates are delivered in 24 to 48 hours. Large or complex projects can take 4 to 5 working days.
Sheet 5 of 7
Questions about structural and misc. steel takeoffs
More on payment, turnaround and revisions in the general questions.
Do you produce a member-by-member list?
Yes. The takeoff lists each member mark or size with its length, unit weight and total weight, and then totals by shape.
How do you handle connections that are not detailed?
We carry them as a stated percentage of framing weight and show that percentage in the spreadsheet. If you have a figure you prefer, tell us and we use it.
Can you split structural from miscellaneous metals?
Yes. They are kept as separate sections, since they are often bought from different fabricators.
30% off
First job with us? It costs less.
New clients get 30% off their first project with Outlay. Single-trade takeoffs start from $50 and a typical project costs about $200 before the offer.
Sheet 6 of 7
Other trades we take off
- 03Concrete
- 04Masonry
- 06Lumber and framing
- 07Roofing and waterproofing
- 08Openings
- 09Drywall
- 09Flooring
- 09Interior and exterior finishes
- 21Fire suppression
- 22Plumbing
- 23Mechanical
- 26Electrical
- 31Sitework and earthwork
Bidding the whole job? See cost estimates and all services.
Sheet 7 of 7
Send your plans for a quote
You get an email back with the fee and the delivery date. After that it is your call.
- No card needed to get a quote
- Your drawings stay confidential
- A person reads every request
- New clients: 30% off your first estimate
Plans sent
A person reads every request. If your bid is due soon and you have not heard from us, reply to our email or write to [email protected].