Roofing, insulation and waterproofing takeoffs
Roof areas measured on the slope, with the flashings, edges, insulation and below-grade waterproofing that turn a square count into a bid.
Nothing to send yet? Ask a question or request a sample.
Division 07Roofing and waterproofing takeoff schedule
| Roof area by system | SQ / SF |
|---|---|
| Roof insulation and cover board | SF |
| Flashing, coping and edge metal | LF |
| Wall and cavity insulation | SF |
| Waterproofing and air barrier | SF |
| Drains, curbs and penetrations | EA |
- Fee and delivery date
- Confirmed before work starts
- Typical delivery
- 24 to 48 hours
- You receive
- Editable Excel estimate and drawing markups
- Priced from
- Cost data for your zip code
- Minor revisions
- No charge
Sheet 2 of 7
What we take off for roofing and waterproofing
Quantities are grouped the way the trade prices its work, so each group can be checked and priced on its own.
Low-slope roofing
TPO, PVC, EPDM and modified bitumen by area, with insulation layers, tapered systems and cover board.
Steep-slope roofing
Shingles, metal panels and tile measured on the pitch, with underlayment, ridges, hips and valleys.
Sheet metal
Coping, gravel stops, counterflashing, gutters and downspouts by length and girth.
Thermal insulation
Batt, rigid and spray insulation in walls, roofs and under slabs, by type and thickness.
Waterproofing
Below-grade membranes, dampproofing, air and vapor barriers and traffic coatings.
Sealants and firestopping
Joint sealants by length and size, and firestopping where it falls in your scope.
Sheet 3 of 7
What the estimate looks like
A few lines from a 20,000 SF low-slope commercial roof, laid out the way your spreadsheet arrives: CSI code, description, measured quantity, unit cost and total.
| CSI code | Description | Quantity | Unit | Unit cost | Total |
|---|---|---|---|---|---|
| 07 22 00 | Roof insulation, polyiso, two layers, R-30 | 20,000 | SF | 3.85 | 77,000 |
| 07 54 23 | TPO membrane roofing, 60 mil, fully adhered | 20,000 | SF | 5.40 | 108,000 |
| 07 62 00 | Parapet coping, prefinished metal, 24" girth | 620 | LF | 28.50 | 17,670 |
| 07 62 00 | Counterflashing at walls and curbs | 480 | LF | 14.00 | 6,720 |
| 07 72 00 | Roof curbs and pipe penetrations, flashed | 18 | EA | 420.00 | 7,560 |
| 07 92 00 | Joint sealants at perimeter and penetrations | 900 | LF | 4.25 | 3,825 |
| Direct cost, these lines | $220,775 | ||||
Illustrative figures for a sample project, not a quote. Your estimate uses your drawings, your location and your markups. See a full sample estimate linked to its plan.
Sheet 4 of 7
What to send, and what comes back
Send us
- The roof plan, roof details and wall sections
- Building elevations, for wall insulation and air barrier
- The Division 07 specification sections
- For re-roofing, the existing roof survey or core information
Missing some of these? Send what you have and we tell you what the gaps mean for the estimate.
You get back
- An editable Excel file, in our template or yours
- Every quantity with its CSI code and unit
- The drawings marked up to show what was measured
- Minor revisions at no charge
Most estimates are delivered in 24 to 48 hours. Large or complex projects can take 4 to 5 working days.
Sheet 5 of 7
Questions about roofing and waterproofing takeoffs
More on payment, turnaround and revisions in the general questions.
Do you measure roof area on the slope?
Yes. Pitched areas are measured on the slope using the pitch from the drawings, and the factor used is shown.
Can you work from aerial measurements or photos?
For re-roofing we can work from a measurement report or scaled images, and we say in the spreadsheet what the quantities were based on.
Do you break out flashings and accessories?
Yes. Edge metal, flashings, drains, curbs and penetrations are their own lines, since that is where roofing bids are won or lost.
30% off
First job with us? It costs less.
New clients get 30% off their first project with Outlay. Single-trade takeoffs start from $50 and a typical project costs about $200 before the offer.
Sheet 6 of 7
Other trades we take off
- 03Concrete
- 04Masonry
- 05Structural and misc. steel
- 06Lumber and framing
- 08Openings
- 09Drywall
- 09Flooring
- 09Interior and exterior finishes
- 21Fire suppression
- 22Plumbing
- 23Mechanical
- 26Electrical
- 31Sitework and earthwork
Bidding the whole job? See cost estimates and all services.
Sheet 7 of 7
Send your plans for a quote
You get an email back with the fee and the delivery date. After that it is your call.
- No card needed to get a quote
- Your drawings stay confidential
- A person reads every request
- New clients: 30% off your first estimate
Plans sent