Plumbing takeoffs and estimates
Fixtures counted and every pipe run measured by system, size and material, from the plans and the riser diagrams.
Nothing to send yet? Ask a question or request a sample.
Division 22Plumbing takeoff schedule
| Fixtures and trim | EA |
|---|---|
| Domestic water piping by size | LF |
| Waste and vent piping by size | LF |
| Fittings and valves | EA |
| Equipment | EA |
| Pipe insulation and hangers | LF / EA |
- Fee and delivery date
- Confirmed before work starts
- Typical delivery
- 24 to 48 hours
- You receive
- Editable Excel estimate and drawing markups
- Priced from
- Cost data for your zip code
- Minor revisions
- No charge
Sheet 2 of 7
What we take off for plumbing
Quantities are grouped the way the trade prices its work, so each group can be checked and priced on its own.
Fixtures
Water closets, lavatories, sinks, tubs, showers, drains and hose bibbs, counted against the fixture schedule.
Domestic water
Hot, cold and recirculation piping measured by size and material, with valves and specialties.
Sanitary and vent
Above-ground and underground waste and vent piping, cleanouts and floor drains.
Storm and gas
Roof drains and storm leaders, and natural gas piping to equipment.
Equipment
Water heaters, pumps, backflow preventers, expansion tanks and interceptors.
Insulation and supports
Pipe insulation by size and thickness, hangers, sleeves and firestopping at penetrations.
Sheet 3 of 7
What the estimate looks like
A few lines from a 24-unit apartment building, laid out the way your spreadsheet arrives: CSI code, description, measured quantity, unit cost and total.
| CSI code | Description | Quantity | Unit | Unit cost | Total |
|---|---|---|---|---|---|
| 22 11 16 | Domestic water piping, PEX, 1/2" to 1" | 5,200 | LF | 6.40 | 33,280 |
| 22 11 16 | Domestic water mains, copper type L, 1-1/2" to 2" | 640 | LF | 38.00 | 24,320 |
| 22 13 16 | Sanitary waste and vent piping, PVC, 2" to 4" | 3,900 | LF | 16.50 | 64,350 |
| 22 40 00 | Plumbing fixtures with trim, residential grade | 144 | EA | 590.00 | 84,960 |
| 22 34 00 | Gas-fired water heater, 100 gallon | 2 | EA | 8,900.00 | 17,800 |
| 22 07 19 | Pipe insulation, domestic hot water | 2,400 | LF | 5.10 | 12,240 |
| Direct cost, these lines | $236,950 | ||||
Illustrative figures for a sample project, not a quote. Your estimate uses your drawings, your location and your markups. See a full sample estimate linked to its plan.
Sheet 4 of 7
What to send, and what comes back
Send us
- The plumbing plans, riser diagrams and schedules
- Architectural plans, for fixture locations
- The site utility plan, if underground work is in your scope
- The Division 22 specification sections
Missing some of these? Send what you have and we tell you what the gaps mean for the estimate.
You get back
- An editable Excel file, in our template or yours
- Every quantity with its CSI code and unit
- The drawings marked up to show what was measured
- Minor revisions at no charge
Most estimates are delivered in 24 to 48 hours. Large or complex projects can take 4 to 5 working days.
Sheet 5 of 7
Questions about plumbing takeoffs
More on payment, turnaround and revisions in the general questions.
Do you measure vertical pipe?
Yes. Risers and drops are measured from the riser diagrams and floor-to-floor heights, not only the plan length.
Do you count fittings?
Fittings are counted where the drawings show the routing. On schematic drawings they are carried as a stated allowance.
Can you split underground from above ground?
Yes. Underground, above-ground rough-in and finish are separate sections, to match how the work is usually phased and billed.
30% off
First job with us? It costs less.
New clients get 30% off their first project with Outlay. Single-trade takeoffs start from $50 and a typical project costs about $200 before the offer.
Sheet 6 of 7
Other trades we take off
- 03Concrete
- 04Masonry
- 05Structural and misc. steel
- 06Lumber and framing
- 07Roofing and waterproofing
- 08Openings
- 09Drywall
- 09Flooring
- 09Interior and exterior finishes
- 21Fire suppression
- 23Mechanical
- 26Electrical
- 31Sitework and earthwork
Bidding the whole job? See cost estimates and all services.
Sheet 7 of 7
Send your plans for a quote
You get an email back with the fee and the delivery date. After that it is your call.
- No card needed to get a quote
- Your drawings stay confidential
- A person reads every request
- New clients: 30% off your first estimate
Plans sent
A person reads every request. If your bid is due soon and you have not heard from us, reply to our email or write to [email protected].