Draft copy. Anything with a dashed red underline is a placeholder to confirm before launch.

New clients: 30% off your first estimate

Outlay Trades Plumbing

Plumbing takeoffs and estimates

Fixtures counted and every pipe run measured by system, size and material, from the plans and the riser diagrams.

Nothing to send yet? Ask a question or request a sample.

22

Division 22Plumbing takeoff schedule

What an Outlay plumbing takeoff measures
Fixtures and trimEA
Domestic water piping by sizeLF
Waste and vent piping by sizeLF
Fittings and valvesEA
EquipmentEA
Pipe insulation and hangersLF / EA
What we measure, and the units you get it in.
Fee and delivery date
Confirmed before work starts
Typical delivery
24 to 48 hours
You receive
Editable Excel estimate and drawing markups
Priced from
Cost data for your zip code
Minor revisions
No charge

Sheet 2 of 7

What we take off for plumbing

Quantities are grouped the way the trade prices its work, so each group can be checked and priced on its own.

  1. Fixtures

    Water closets, lavatories, sinks, tubs, showers, drains and hose bibbs, counted against the fixture schedule.

  2. Domestic water

    Hot, cold and recirculation piping measured by size and material, with valves and specialties.

  3. Sanitary and vent

    Above-ground and underground waste and vent piping, cleanouts and floor drains.

  4. Storm and gas

    Roof drains and storm leaders, and natural gas piping to equipment.

  5. Equipment

    Water heaters, pumps, backflow preventers, expansion tanks and interceptors.

  6. Insulation and supports

    Pipe insulation by size and thickness, hangers, sleeves and firestopping at penetrations.

Sheet 3 of 7

What the estimate looks like

A few lines from a 24-unit apartment building, laid out the way your spreadsheet arrives: CSI code, description, measured quantity, unit cost and total.

CSI codeDescriptionQuantityUnitUnit costTotal
22 11 16Domestic water piping, PEX, 1/2" to 1"5,200LF6.4033,280
22 11 16Domestic water mains, copper type L, 1-1/2" to 2"640LF38.0024,320
22 13 16Sanitary waste and vent piping, PVC, 2" to 4"3,900LF16.5064,350
22 40 00Plumbing fixtures with trim, residential grade144EA590.0084,960
22 34 00Gas-fired water heater, 100 gallon2EA8,900.0017,800
22 07 19Pipe insulation, domestic hot water2,400LF5.1012,240
Direct cost, these lines$236,950

Illustrative figures for a sample project, not a quote. Your estimate uses your drawings, your location and your markups. See a full sample estimate linked to its plan.

Sheet 4 of 7

What to send, and what comes back

Send us

  • The plumbing plans, riser diagrams and schedules
  • Architectural plans, for fixture locations
  • The site utility plan, if underground work is in your scope
  • The Division 22 specification sections

Missing some of these? Send what you have and we tell you what the gaps mean for the estimate.

You get back

  • An editable Excel file, in our template or yours
  • Every quantity with its CSI code and unit
  • The drawings marked up to show what was measured
  • Minor revisions at no charge

Most estimates are delivered in 24 to 48 hours. Large or complex projects can take 4 to 5 working days.

Sheet 5 of 7

Questions about plumbing takeoffs

More on payment, turnaround and revisions in the general questions.

Do you measure vertical pipe?

Yes. Risers and drops are measured from the riser diagrams and floor-to-floor heights, not only the plan length.

Do you count fittings?

Fittings are counted where the drawings show the routing. On schematic drawings they are carried as a stated allowance.

Can you split underground from above ground?

Yes. Underground, above-ground rough-in and finish are separate sections, to match how the work is usually phased and billed.

30% off

First job with us? It costs less.

New clients get 30% off their first project with Outlay. Single-trade takeoffs start from $50 and a typical project costs about $200 before the offer.

Upload plans

Sheet 6 of 7

Other trades we take off

Bidding the whole job? See cost estimates and all services.

Sheet 7 of 7

Send your plans for a quote

You get an email back with the fee and the delivery date. After that it is your call.

  • No card needed to get a quote
  • Your drawings stay confidential
  • A person reads every request
  • New clients: 30% off your first estimate

    New clients

    30% off

    your first estimate

    Upload your plans and we reply with the discounted fee and a delivery date. You decide after that, and you owe nothing if you say no.

    Upload plans