Fire sprinkler takeoffs and estimates
Heads counted and pipe measured by size from the sprinkler drawings, with the valves, risers and hangers that complete the system.
Nothing to send yet? Ask a question or request a sample.
Division 21Fire suppression takeoff schedule
| Sprinkler heads by type | EA |
|---|---|
| Pipe by size and material | LF |
| Fittings | EA |
| Valves and devices | EA |
| Risers and standpipes | EA / LF |
| Hangers and seismic bracing | EA |
- Fee and delivery date
- Confirmed before work starts
- Typical delivery
- 24 to 48 hours
- You receive
- Editable Excel estimate and drawing markups
- Priced from
- Cost data for your zip code
- Minor revisions
- No charge
Sheet 2 of 7
What we take off for fire suppression
Quantities are grouped the way the trade prices its work, so each group can be checked and priced on its own.
Sprinkler heads
Pendent, upright, sidewall and concealed heads counted by type, temperature rating and finish.
Pipe
Mains and branch lines measured by diameter and material, with drops and sprigs counted.
Fittings
Elbows, tees, couplings and reducers counted from the layout, or carried as a stated allowance on early drawings.
Valves and trim
Control valves, check valves, alarm valves, flow and tamper switches and test connections.
Risers and standpipes
System risers, standpipes, hose valves and the fire department connection.
Supports
Hangers at the spacing the pipe size requires, and seismic bracing where it is specified.
Sheet 3 of 7
What the estimate looks like
A few lines from a 30,000 SF light-hazard office floor, laid out the way your spreadsheet arrives: CSI code, description, measured quantity, unit cost and total.
| CSI code | Description | Quantity | Unit | Unit cost | Total |
|---|---|---|---|---|---|
| 21 13 13 | Sprinkler heads, pendent, quick response | 285 | EA | 68.00 | 19,380 |
| 21 13 13 | Branch piping, 1" black steel, threaded | 3,100 | LF | 14.50 | 44,950 |
| 21 13 13 | Cross mains, 2-1/2" black steel, grooved | 780 | LF | 31.00 | 24,180 |
| 21 13 13 | Feed main, 4" black steel, grooved | 240 | LF | 52.00 | 12,480 |
| 21 13 13 | Wet system riser assembly with trim, 4" | 1 | EA | 7,400.00 | 7,400 |
| 21 05 29 | Hangers and supports | 520 | EA | 22.00 | 11,440 |
| Direct cost, these lines | $119,830 | ||||
Illustrative figures for a sample project, not a quote. Your estimate uses your drawings, your location and your markups. See a full sample estimate linked to its plan.
Sheet 4 of 7
What to send, and what comes back
Send us
- The fire protection drawings, or the architectural plans and reflected ceiling plans
- The hazard classification and design criteria
- The Division 21 specification sections
- Water supply information, if available
Missing some of these? Send what you have and we tell you what the gaps mean for the estimate.
You get back
- An editable Excel file, in our template or yours
- Every quantity with its CSI code and unit
- The drawings marked up to show what was measured
- Minor revisions at no charge
Most estimates are delivered in 24 to 48 hours. Large or complex projects can take 4 to 5 working days.
Sheet 5 of 7
Questions about fire suppression takeoffs
More on payment, turnaround and revisions in the general questions.
Can you estimate before the sprinkler design is done?
Yes. From architectural plans and the hazard classification we prepare a preliminary estimate by head spacing and area, and we mark it as preliminary.
Do you count fittings?
On designed drawings, yes. On early drawings fittings are carried as a stated percentage of pipe cost.
Do you do the hydraulic design?
No. We measure and price the system shown. Design and hydraulic calculations stay with your designer.
30% off
First job with us? It costs less.
New clients get 30% off their first project with Outlay. Single-trade takeoffs start from $50 and a typical project costs about $200 before the offer.
Sheet 6 of 7
Other trades we take off
- 03Concrete
- 04Masonry
- 05Structural and misc. steel
- 06Lumber and framing
- 07Roofing and waterproofing
- 08Openings
- 09Drywall
- 09Flooring
- 09Interior and exterior finishes
- 22Plumbing
- 23Mechanical
- 26Electrical
- 31Sitework and earthwork
Bidding the whole job? See cost estimates and all services.
Sheet 7 of 7
Send your plans for a quote
You get an email back with the fee and the delivery date. After that it is your call.
- No card needed to get a quote
- Your drawings stay confidential
- A person reads every request
- New clients: 30% off your first estimate
Plans sent
A person reads every request. If your bid is due soon and you have not heard from us, reply to our email or write to [email protected].