Lumber and framing takeoffs
A material list your yard can quote from: studs, plates, joists, trusses, sheathing and hardware, counted by size and length from the framing plans.
Nothing to send yet? Ask a question or request a sample.
Division 06Lumber and framing takeoff schedule
| Studs and plates by size | EA / LF |
|---|---|
| Joists, rafters and beams | EA / LF |
| Engineered lumber | LF |
| Trusses | EA |
| Sheathing and subfloor | SHT / SF |
| Connectors and fasteners | EA |
- Fee and delivery date
- Confirmed before work starts
- Typical delivery
- 24 to 48 hours
- You receive
- Editable Excel estimate and drawing markups
- Priced from
- Cost data for your zip code
- Minor revisions
- No charge
Sheet 2 of 7
What we take off for lumber and framing
Quantities are grouped the way the trade prices its work, so each group can be checked and priced on its own.
Wall framing
Studs, plates, headers, cripples and blocking for each wall type, counted to the plate heights on the sections.
Floor framing
Joists, rim boards, beams, posts and subfloor, including I-joists and LVL where they are specified.
Roof framing
Rafters, ridge and hip members, or a truss count by profile and span when the roof is trussed.
Sheathing
Wall and roof sheathing and subfloor in sheets, with the square footage beside it.
Hardware
Hangers, straps, hold-downs and anchor bolts from the structural details and schedules.
Exterior and finish carpentry
Fascia, trim, decking and interior trim when they are part of your scope.
Sheet 3 of 7
What the estimate looks like
A few lines from a two-storey, 2,800 SF wood-framed house, laid out the way your spreadsheet arrives: CSI code, description, measured quantity, unit cost and total.
| CSI code | Description | Quantity | Unit | Unit cost | Total |
|---|---|---|---|---|---|
| 06 11 00 | Wall framing, 2x6 studs at 16" o.c. with plates | 5,400 | SF | 4.60 | 24,840 |
| 06 11 00 | Floor framing, 11-7/8" I-joists at 16" o.c. | 1,400 | SF | 5.90 | 8,260 |
| 06 16 00 | Wall sheathing, 7/16" OSB | 5,400 | SF | 1.55 | 8,370 |
| 06 16 00 | Roof sheathing, 5/8" plywood | 2,100 | SF | 2.15 | 4,515 |
| 06 17 53 | Shop-fabricated roof trusses, 28 ft span | 38 | EA | 285.00 | 10,830 |
| 06 05 23 | Framing connectors, hangers and hold-downs | 1 | LS | 3,400.00 | 3,400 |
| Direct cost, these lines | $60,215 | ||||
Illustrative figures for a sample project, not a quote. Your estimate uses your drawings, your location and your markups. See a full sample estimate linked to its plan.
Sheet 4 of 7
What to send, and what comes back
Send us
- Architectural plans, elevations and sections
- Structural or framing plans, if they exist
- The truss layout, if a supplier has prepared one
- Your preferred stud spacing and lumber grades, if the drawings leave them open
Missing some of these? Send what you have and we tell you what the gaps mean for the estimate.
You get back
- An editable Excel file, in our template or yours
- Every quantity with its CSI code and unit
- The drawings marked up to show what was measured
- Minor revisions at no charge
Most estimates are delivered in 24 to 48 hours. Large or complex projects can take 4 to 5 working days.
Sheet 5 of 7
Questions about lumber and framing takeoffs
More on payment, turnaround and revisions in the general questions.
Is the list in order lengths?
Yes. Members are listed by size and stock length, so the list can go to a lumber yard as it is.
Can you work from architectural drawings only?
Yes. Where there are no framing plans we frame to standard practice and the spans shown, and we note every assumption in the spreadsheet.
Do you include a waste factor?
Waste is shown as its own percentage by material, not buried in the counts, so you can set it to match your crews.
30% off
First job with us? It costs less.
New clients get 30% off their first project with Outlay. Single-trade takeoffs start from $50 and a typical project costs about $200 before the offer.
Sheet 6 of 7
Other trades we take off
- 03Concrete
- 04Masonry
- 05Structural and misc. steel
- 07Roofing and waterproofing
- 08Openings
- 09Drywall
- 09Flooring
- 09Interior and exterior finishes
- 21Fire suppression
- 22Plumbing
- 23Mechanical
- 26Electrical
- 31Sitework and earthwork
Bidding the whole job? See cost estimates and all services.
Sheet 7 of 7
Send your plans for a quote
You get an email back with the fee and the delivery date. After that it is your call.
- No card needed to get a quote
- Your drawings stay confidential
- A person reads every request
- New clients: 30% off your first estimate
Plans sent
A person reads every request. If your bid is due soon and you have not heard from us, reply to our email or write to [email protected].