Draft copy. Anything with a dashed red underline is a placeholder to confirm before launch.

New clients: 30% off your first estimate

Outlay Trades Lumber and framing

Lumber and framing takeoffs

A material list your yard can quote from: studs, plates, joists, trusses, sheathing and hardware, counted by size and length from the framing plans.

Nothing to send yet? Ask a question or request a sample.

06

Division 06Lumber and framing takeoff schedule

What an Outlay lumber and framing takeoff measures
Studs and plates by sizeEA / LF
Joists, rafters and beamsEA / LF
Engineered lumberLF
TrussesEA
Sheathing and subfloorSHT / SF
Connectors and fastenersEA
What we measure, and the units you get it in.
Fee and delivery date
Confirmed before work starts
Typical delivery
24 to 48 hours
You receive
Editable Excel estimate and drawing markups
Priced from
Cost data for your zip code
Minor revisions
No charge

Sheet 2 of 7

What we take off for lumber and framing

Quantities are grouped the way the trade prices its work, so each group can be checked and priced on its own.

  1. Wall framing

    Studs, plates, headers, cripples and blocking for each wall type, counted to the plate heights on the sections.

  2. Floor framing

    Joists, rim boards, beams, posts and subfloor, including I-joists and LVL where they are specified.

  3. Roof framing

    Rafters, ridge and hip members, or a truss count by profile and span when the roof is trussed.

  4. Sheathing

    Wall and roof sheathing and subfloor in sheets, with the square footage beside it.

  5. Hardware

    Hangers, straps, hold-downs and anchor bolts from the structural details and schedules.

  6. Exterior and finish carpentry

    Fascia, trim, decking and interior trim when they are part of your scope.

Sheet 3 of 7

What the estimate looks like

A few lines from a two-storey, 2,800 SF wood-framed house, laid out the way your spreadsheet arrives: CSI code, description, measured quantity, unit cost and total.

CSI codeDescriptionQuantityUnitUnit costTotal
06 11 00Wall framing, 2x6 studs at 16" o.c. with plates5,400SF4.6024,840
06 11 00Floor framing, 11-7/8" I-joists at 16" o.c.1,400SF5.908,260
06 16 00Wall sheathing, 7/16" OSB5,400SF1.558,370
06 16 00Roof sheathing, 5/8" plywood2,100SF2.154,515
06 17 53Shop-fabricated roof trusses, 28 ft span38EA285.0010,830
06 05 23Framing connectors, hangers and hold-downs1LS3,400.003,400
Direct cost, these lines$60,215

Illustrative figures for a sample project, not a quote. Your estimate uses your drawings, your location and your markups. See a full sample estimate linked to its plan.

Sheet 4 of 7

What to send, and what comes back

Send us

  • Architectural plans, elevations and sections
  • Structural or framing plans, if they exist
  • The truss layout, if a supplier has prepared one
  • Your preferred stud spacing and lumber grades, if the drawings leave them open

Missing some of these? Send what you have and we tell you what the gaps mean for the estimate.

You get back

  • An editable Excel file, in our template or yours
  • Every quantity with its CSI code and unit
  • The drawings marked up to show what was measured
  • Minor revisions at no charge

Most estimates are delivered in 24 to 48 hours. Large or complex projects can take 4 to 5 working days.

Sheet 5 of 7

Questions about lumber and framing takeoffs

More on payment, turnaround and revisions in the general questions.

Is the list in order lengths?

Yes. Members are listed by size and stock length, so the list can go to a lumber yard as it is.

Can you work from architectural drawings only?

Yes. Where there are no framing plans we frame to standard practice and the spans shown, and we note every assumption in the spreadsheet.

Do you include a waste factor?

Waste is shown as its own percentage by material, not buried in the counts, so you can set it to match your crews.

30% off

First job with us? It costs less.

New clients get 30% off their first project with Outlay. Single-trade takeoffs start from $50 and a typical project costs about $200 before the offer.

Upload plans

Sheet 6 of 7

Other trades we take off

Bidding the whole job? See cost estimates and all services.

Sheet 7 of 7

Send your plans for a quote

You get an email back with the fee and the delivery date. After that it is your call.

  • No card needed to get a quote
  • Your drawings stay confidential
  • A person reads every request
  • New clients: 30% off your first estimate

    New clients

    30% off

    your first estimate

    Upload your plans and we reply with the discounted fee and a delivery date. You decide after that, and you owe nothing if you say no.

    Upload plans