Sitework and earthwork takeoffs
Cut and fill worked out from the grading plan, with paving, curbs, utilities and erosion control measured from the civil drawings.
Nothing to send yet? Ask a question or request a sample.
Division 31Sitework and earthwork takeoff schedule
| Cut and fill | CY |
|---|---|
| Clearing and stripping | AC / SF |
| Paving and base | SY / TON |
| Curbs, walks and site concrete | LF / SF |
| Utility pipe and structures | LF / EA |
| Erosion control | LF / EA |
- Fee and delivery date
- Confirmed before work starts
- Typical delivery
- 24 to 48 hours
- You receive
- Editable Excel estimate and drawing markups
- Priced from
- Cost data for your zip code
- Minor revisions
- No charge
Sheet 2 of 7
What we take off for sitework and earthwork
Quantities are grouped the way the trade prices its work, so each group can be checked and priced on its own.
Earthwork
Cut and fill volumes from existing and proposed contours, with topsoil stripping, import and export.
Site preparation
Clearing, demolition and removals, measured from the existing conditions plan.
Paving
Asphalt and concrete paving by area, with aggregate base and subgrade preparation.
Site concrete
Curb and gutter, sidewalks, ramps and pads.
Utilities
Storm, sanitary and water pipe by size and depth range, with manholes, inlets and connections.
Erosion control and landscaping
Silt fence, inlet protection and construction entrances, plus seeding, sod and planting if required.
Sheet 3 of 7
What the estimate looks like
A few lines from a two-acre commercial site, laid out the way your spreadsheet arrives: CSI code, description, measured quantity, unit cost and total.
| CSI code | Description | Quantity | Unit | Unit cost | Total |
|---|---|---|---|---|---|
| 31 10 00 | Site clearing and topsoil stripping | 2 | AC | 6,800.00 | 13,600 |
| 31 23 16 | Excavation, cut to fill on site | 4,800 | CY | 7.50 | 36,000 |
| 31 23 23 | Imported structural fill, placed and compacted | 1,900 | CY | 34.00 | 64,600 |
| 31 25 00 | Silt fence | 1,400 | LF | 4.20 | 5,880 |
| 32 12 16 | Asphalt paving, 3" on 8" aggregate base | 5,600 | SY | 38.50 | 215,600 |
| 32 16 13 | Concrete curb and gutter | 2,100 | LF | 29.00 | 60,900 |
| Direct cost, these lines | $396,580 | ||||
Illustrative figures for a sample project, not a quote. Your estimate uses your drawings, your location and your markups. See a full sample estimate linked to its plan.
Sheet 4 of 7
What to send, and what comes back
Send us
- The civil drawings: existing conditions, grading, utility and paving plans
- CAD files of the surfaces, if available
- The geotechnical report
- The Division 31 to 33 specification sections
Missing some of these? Send what you have and we tell you what the gaps mean for the estimate.
You get back
- An editable Excel file, in our template or yours
- Every quantity with its CSI code and unit
- The drawings marked up to show what was measured
- Minor revisions at no charge
Most estimates are delivered in 24 to 48 hours. Large or complex projects can take 4 to 5 working days.
Sheet 5 of 7
Questions about sitework and earthwork takeoffs
More on payment, turnaround and revisions in the general questions.
How do you calculate cut and fill?
From the existing and proposed contours or spot elevations on the grading plan. The result shows cut, fill and the net import or export.
Do you allow for shrink and swell?
Volumes are shown in bank measure first. Shrink and swell factors are applied as separate, visible figures that you can change to suit the soil.
Can you work from PDF drawings?
Yes. CAD surfaces are quicker to work from, but PDF grading plans with legible contours are enough.
30% off
First job with us? It costs less.
New clients get 30% off their first project with Outlay. Single-trade takeoffs start from $50 and a typical project costs about $200 before the offer.
Sheet 6 of 7
Other trades we take off
- 03Concrete
- 04Masonry
- 05Structural and misc. steel
- 06Lumber and framing
- 07Roofing and waterproofing
- 08Openings
- 09Drywall
- 09Flooring
- 09Interior and exterior finishes
- 21Fire suppression
- 22Plumbing
- 23Mechanical
- 26Electrical
Bidding the whole job? See cost estimates and all services.
Sheet 7 of 7
Send your plans for a quote
You get an email back with the fee and the delivery date. After that it is your call.
- No card needed to get a quote
- Your drawings stay confidential
- A person reads every request
- New clients: 30% off your first estimate
Plans sent
A person reads every request. If your bid is due soon and you have not heard from us, reply to our email or write to [email protected].