31

Division 31Sitework and earthwork takeoff schedule

What an Outlay sitework and earthwork takeoff measures
Cut and fillCY
Clearing and strippingAC / SF
Paving and baseSY / TON
Curbs, walks and site concreteLF / SF
Utility pipe and structuresLF / EA
Erosion controlLF / EA
What we measure, and the units you get it in.
Fee and delivery date
Confirmed before work starts
Typical delivery
24 to 48 hours
You receive
Editable Excel estimate and drawing markups
Priced from
Cost data for your zip code
Minor revisions
No charge

Sheet 2 of 7

What we take off for sitework and earthwork

Quantities are grouped the way the trade prices its work, so each group can be checked and priced on its own.

  1. Earthwork

    Cut and fill volumes from existing and proposed contours, with topsoil stripping, import and export.

  2. Site preparation

    Clearing, demolition and removals, measured from the existing conditions plan.

  3. Paving

    Asphalt and concrete paving by area, with aggregate base and subgrade preparation.

  4. Site concrete

    Curb and gutter, sidewalks, ramps and pads.

  5. Utilities

    Storm, sanitary and water pipe by size and depth range, with manholes, inlets and connections.

  6. Erosion control and landscaping

    Silt fence, inlet protection and construction entrances, plus seeding, sod and planting if required.

Sheet 3 of 7

What the estimate looks like

A few lines from a two-acre commercial site, laid out the way your spreadsheet arrives: CSI code, description, measured quantity, unit cost and total.

CSI codeDescriptionQuantityUnitUnit costTotal
31 10 00Site clearing and topsoil stripping2AC6,800.0013,600
31 23 16Excavation, cut to fill on site4,800CY7.5036,000
31 23 23Imported structural fill, placed and compacted1,900CY34.0064,600
31 25 00Silt fence1,400LF4.205,880
32 12 16Asphalt paving, 3" on 8" aggregate base5,600SY38.50215,600
32 16 13Concrete curb and gutter2,100LF29.0060,900
Direct cost, these lines$396,580

Illustrative figures for a sample project, not a quote. Your estimate uses your drawings, your location and your markups. See a full sample estimate linked to its plan.

Sheet 4 of 7

What to send, and what comes back

Send us

  • The civil drawings: existing conditions, grading, utility and paving plans
  • CAD files of the surfaces, if available
  • The geotechnical report
  • The Division 31 to 33 specification sections

Missing some of these? Send what you have and we tell you what the gaps mean for the estimate.

You get back

  • An editable Excel file, in our template or yours
  • Every quantity with its CSI code and unit
  • The drawings marked up to show what was measured
  • Minor revisions at no charge

Most estimates are delivered in 24 to 48 hours. Large or complex projects can take 4 to 5 working days.

Sheet 5 of 7

Questions about sitework and earthwork takeoffs

More on payment, turnaround and revisions in the general questions.

How do you calculate cut and fill?

From the existing and proposed contours or spot elevations on the grading plan. The result shows cut, fill and the net import or export.

Do you allow for shrink and swell?

Volumes are shown in bank measure first. Shrink and swell factors are applied as separate, visible figures that you can change to suit the soil.

Can you work from PDF drawings?

Yes. CAD surfaces are quicker to work from, but PDF grading plans with legible contours are enough.

30% off

First job with us? It costs less.

New clients get 30% off their first project with Outlay. Single-trade takeoffs start from $50 and a typical project costs about $200 before the offer.

Upload plans

Sheet 6 of 7

Other trades we take off

Bidding the whole job? See cost estimates and all services.

Sheet 7 of 7

Send your plans for a quote

You get an email back with the fee and the delivery date. After that it is your call.

  • No card needed to get a quote
  • Your drawings stay confidential
  • A person reads every request
  • New clients: 30% off your first estimate

    New clients

    30% off

    your first estimate

    Upload your plans and we reply with the discounted fee and a delivery date. You decide after that, and you owe nothing if you say no.

    Upload plans