Draft copy. Anything with a dashed red underline is a placeholder to confirm before launch.

New clients: 30% off your first estimate

Outlay Trades Masonry

Masonry takeoffs and estimates

Block, brick and stone counted from your elevations and wall sections, with the mortar, grout, reinforcing and accessories that go with them.

Nothing to send yet? Ask a question or request a sample.

04

Division 04Masonry takeoff schedule

What an Outlay masonry takeoff measures
Concrete block by size and typeEA / SF
Face brick and veneerEA / SF
Mortar and groutCF / CY
Wall reinforcing and tiesLF / EA
Lintels, sills and copingsLF / EA
Flashing and control jointsLF
What we measure, and the units you get it in.
Fee and delivery date
Confirmed before work starts
Typical delivery
24 to 48 hours
You receive
Editable Excel estimate and drawing markups
Priced from
Cost data for your zip code
Minor revisions
No charge

Sheet 2 of 7

What we take off for masonry

Quantities are grouped the way the trade prices its work, so each group can be checked and priced on its own.

  1. Concrete masonry

    Block by width, weight and finish, with bond beams, lintel block and half units counted separately.

  2. Brick and veneer

    Face brick by type and bond, soldier and rowlock courses, with openings deducted from the elevations.

  3. Stone and cast stone

    Stone veneer by area, plus sills, bands, copings and trim pieces by length or count.

  4. Mortar and grout

    Mortar by wall area and unit size, grout for filled cells and bond beams, in the units your supplier quotes.

  5. Reinforcing and anchors

    Vertical bar, horizontal joint reinforcing, veneer ties and anchors at the spacing on the drawings.

  6. Accessories

    Through-wall flashing, weeps, control and expansion joints, cavity insulation and cleaning.

Sheet 3 of 7

What the estimate looks like

A few lines from a single-storey CMU building with brick veneer, laid out the way your spreadsheet arrives: CSI code, description, measured quantity, unit cost and total.

CSI codeDescriptionQuantityUnitUnit costTotal
04 05 16Masonry grout, filled cells and bond beams42CY310.0013,020
04 05 19Horizontal joint reinforcing, 16" o.c.9,800LF0.555,390
04 21 13Face brick veneer, modular, running bond4,200SF24.50102,900
04 22 00Concrete block, 8" standard weight9,600SF14.25136,800
04 22 00Concrete block, 8" bond beam with two #51,150LF21.0024,150
07 62 00Through-wall flashing with weeps880LF9.758,580
Direct cost, these lines$290,840

Illustrative figures for a sample project, not a quote. Your estimate uses your drawings, your location and your markups. See a full sample estimate linked to its plan.

Sheet 4 of 7

What to send, and what comes back

Send us

  • Architectural elevations and wall sections
  • Floor plans with wall types
  • Structural drawings, for reinforcing and grout
  • The masonry specification section

Missing some of these? Send what you have and we tell you what the gaps mean for the estimate.

You get back

  • An editable Excel file, in our template or yours
  • Every quantity with its CSI code and unit
  • The drawings marked up to show what was measured
  • Minor revisions at no charge

Most estimates are delivered in 24 to 48 hours. Large or complex projects can take 4 to 5 working days.

Sheet 5 of 7

Questions about masonry takeoffs

More on payment, turnaround and revisions in the general questions.

Do you count units or measure area?

Both. Walls are measured by area and converted to unit counts for the block or brick size specified, so you can order from the count and check it against the area.

Are openings deducted?

Yes. Doors, windows and louvers are deducted, and the lintels, sills and jamb units they need are added as their own lines.

Can you take off veneer only?

Yes. Send the scope you are bidding and we measure only that, whether it is veneer, structural block or both.

30% off

First job with us? It costs less.

New clients get 30% off their first project with Outlay. Single-trade takeoffs start from $50 and a typical project costs about $200 before the offer.

Upload plans

Sheet 6 of 7

Other trades we take off

Bidding the whole job? See cost estimates and all services.

Sheet 7 of 7

Send your plans for a quote

You get an email back with the fee and the delivery date. After that it is your call.

  • No card needed to get a quote
  • Your drawings stay confidential
  • A person reads every request
  • New clients: 30% off your first estimate

    New clients

    30% off

    your first estimate

    Upload your plans and we reply with the discounted fee and a delivery date. You decide after that, and you owe nothing if you say no.

    Upload plans