Outlay Trades Concrete

Concrete takeoffs and estimates

We measure every footing, slab, wall and bar from your structural drawings and return the yards, tons and square feet you need to price the pour.

Nothing to send yet? Ask a question or request a sample.

03

Division 03Concrete takeoff schedule

What an Outlay concrete takeoff measures
Footings and grade beamsCY
Slabs on grade and elevated slabsSF / CY
Walls, columns and piersCY
Reinforcing bar by sizeLB / TON
Formwork contact areaSFCA
Finishing and curingSF
What we measure, and the units you get it in.
Fee and delivery date
Confirmed before work starts
Typical delivery
24 to 48 hours
You receive
Editable Excel estimate and drawing markups
Priced from
Cost data for your zip code
Minor revisions
No charge

Sheet 2 of 7

What we take off for concrete

Quantities are grouped the way the trade prices its work, so each group can be checked and priced on its own.

  1. Foundations

    Spread and strip footings, grade beams, pile caps and pier pads, measured by type from the foundation plan and schedule.

  2. Slabs

    Slabs on grade, thickened edges, elevated decks and toppings, with vapor barrier and base course where the drawings call for them.

  3. Vertical concrete

    Foundation and retaining walls, columns, pilasters and shear walls, taken off to the heights on the sections.

  4. Reinforcing

    Rebar by bar size with laps and hooks, welded wire reinforcement, dowels and chairs, totalled in pounds and tons.

  5. Formwork

    Contact area for walls, columns, edges and elevated work, kept separate so you can price it your way.

  6. Finishes and accessories

    Trowel and broom finishes, curing, control and expansion joints, embeds and anchor bolts.

Sheet 3 of 7

What the estimate looks like

A few lines from a slab-on-grade retail shell, laid out the way your spreadsheet arrives: CSI code, description, measured quantity, unit cost and total.

CSI codeDescriptionQuantityUnitUnit costTotal
03 11 00Formwork, foundation walls and slab edges3,200SFCA9.5030,400
03 21 00Reinforcing bar, grade 60, placed14.5TON2,450.0035,525
03 22 00Welded wire reinforcement, 6x6 W2.912,000SF0.8510,200
03 30 00Cast-in-place concrete, 4,000 psi, footings and walls118CY245.0028,910
03 30 00Cast-in-place concrete, 4,000 psi, slab on grade 5"185CY228.0042,180
03 35 00Slab finishing, steel trowel, with curing compound12,000SF1.2014,400
Direct cost, these lines$161,615

Illustrative figures for a sample project, not a quote. Your estimate uses your drawings, your location and your markups. See a full sample estimate linked to its plan.

Sheet 4 of 7

What to send, and what comes back

Send us

  • Structural drawings: foundation plan, framing plans, sections and schedules
  • Architectural plans, for slab edges and depressions
  • The concrete and reinforcing specification sections
  • The geotechnical report, if it affects footing sizes

Missing some of these? Send what you have and we tell you what the gaps mean for the estimate.

You get back

  • An editable Excel file, in our template or yours
  • Every quantity with its CSI code and unit
  • The drawings marked up to show what was measured
  • Minor revisions at no charge

Most estimates are delivered in 24 to 48 hours. Large or complex projects can take 4 to 5 working days.

Sheet 5 of 7

Questions about concrete takeoffs

More on payment, turnaround and revisions in the general questions.

Do you add waste to concrete and rebar quantities?

Quantities are measured net from the drawings. Waste and lap allowances are shown as separate percentages in the spreadsheet, so you can see them and change them.

Can you separate the quantities by pour or by area?

Yes. Tell us how you want the takeoff broken down, by building, level, pour or phase, and the spreadsheet is organised that way.

Do you price labor as well as material?

A cost estimate carries material, labor and equipment for each line. If you only need quantities, ask for a takeoff and you get the measured schedule without pricing.

30% off

First job with us? It costs less.

New clients get 30% off their first project with Outlay. Single-trade takeoffs start from $50 and a typical project costs about $200 before the offer.

Upload plans

Sheet 6 of 7

Other trades we take off

Bidding the whole job? See cost estimates and all services.

Sheet 7 of 7

Send your plans for a quote

You get an email back with the fee and the delivery date. After that it is your call.

  • No card needed to get a quote
  • Your drawings stay confidential
  • A person reads every request
  • New clients: 30% off your first estimate

    New clients

    30% off

    your first estimate

    Upload your plans and we reply with the discounted fee and a delivery date. You decide after that, and you owe nothing if you say no.

    Upload plans