Construction cost estimates
A priced estimate for the whole job or for your trade: every quantity measured from the drawings, then costed for material, labor and equipment at rates for your zip code.
Nothing to send yet? Ask a question or request a sample.
ServiceCost estimate
| Scope | Full project or single trade |
|---|---|
| Format | Editable Excel, CSI coded |
| Cost data | RSMeans by zip code, or your rates |
| Markups | Your overhead, profit and tax |
| Typical delivery | 24 to 48 hours |
| Minor revisions | No charge |
- Fee and delivery date
- Confirmed before work starts
- Typical delivery
- 24 to 48 hours
- You receive
- Editable Excel estimate and drawing markups
- Priced from
- Cost data for your zip code
- Minor revisions
- No charge
Sheet 2 of 6
What is included
Each part is quoted before work starts, so you know what you are getting and what it costs.
Measured quantities
Every line starts as a quantity taken off the drawings, with the markups to show where it came from.
Material, labor and equipment
Each line is priced in three parts, so you can see what drives the number and adjust any of them.
Local pricing
Unit costs come from construction cost databases such as RSMeans, adjusted to the zip code of the project.
Your rates
If you have your own labor rates, supplier quotes or unit prices, send them and the estimate is built on those.
Markups
General conditions, overhead, profit, contingency and tax are separate, visible lines at the percentages you give us.
Summary by division
A one-page summary by CSI division, with the cost per square foot, for the owner or the lender.
Sheet 3 of 6
What to send, and what comes back
Send us
- The full drawing set, or the sheets for your trade
- The specifications, if they exist
- Your markups and any rates or quotes you want used
- Your bid date
Missing some of these? Send what you have and we tell you what the gaps mean for the estimate.
You get back
- An editable Excel file, in our template or yours
- The fee and delivery date, before any work starts
- The drawings marked up to show what was measured
- Minor revisions at no charge
Most estimates are delivered in 24 to 48 hours. Large or complex projects can take 4 to 5 working days.
Sheet 4 of 6
Questions about this service
More on payment, turnaround and revisions in the general questions.
What is the difference between a takeoff and an estimate?
A takeoff is the measured quantities only. A cost estimate prices those quantities for material, labor and equipment and adds your markups to reach a total.
Can you use my own template?
Yes. Send your spreadsheet and the estimate is delivered in it. Otherwise you get ours.
Who is this for?
General contractors pricing a full bid, subcontractors pricing their trade, and owners, developers, architects and lenders who need to know what a design will cost.
30% off
First job with us? It costs less.
New clients get 30% off their first project with Outlay. Single-trade takeoffs start from $50 and a typical project costs about $200 before the offer.
Sheet 5 of 6
Other services
- Quantity and material takeoff
- Preliminary estimate
- Bid management
- Estimating consultant
- Monthly estimating package
Need one trade measured? See all trades.
Sheet 6 of 6
Send your plans for a quote
You get an email back with the fee and the delivery date. After that it is your call.
- No card needed to get a quote
- Your drawings stay confidential
- A person reads every request
- New clients: 30% off your first estimate
Plans sent
A person reads every request. If your bid is due soon and you have not heard from us, reply to our email or write to [email protected].