Takeoff or estimate: which one do you need?

A takeoff tells you how much. An estimate tells you how much it costs. Knowing which to ask for saves you paying for work you would redo anyway.

Contractors use the two words as if they meant the same thing. They do not, and the difference decides what you should order and what you should expect to get back.

A takeoff is the quantities

A quantity takeoff is every measurable item on the drawings, counted or measured and written down with its unit: 2,400 square feet of carpet tile, 272 linear feet of partition, 8 doors. Nothing is priced. A good takeoff also tells you where each number came from, with the drawings marked up to show the areas, runs and counts behind it.

A material takeoff goes one step further and converts those quantities into what you buy: sheets of board, boxes of tile, lengths of stud.

An estimate is the quantities, priced

A cost estimate starts with the same takeoff and then prices every line for material, labor and equipment. On top of that direct cost it adds general conditions, overhead, profit and any contingency, to reach a total you could put in a bid.

Which to order

  • Order a takeoff if you already know your prices. Most subcontractors do: you know what your crew installs in a day and what your supplier charges. What you are short of is the hours to measure. You take our quantities and apply your own rates.
  • Order an estimate if you need the number itself: a general contractor pricing trades you do not self-perform, a developer checking a budget, or a subcontractor moving into work you have not priced before.
  • Order a preliminary estimate if the drawings are not finished and you need a budget, not a bid.

What to check when it arrives

Whichever you order, three things tell you whether it can be trusted:

  1. Can you trace a number? Pick any line and find it on the marked-up drawing. If you cannot, you cannot check it.
  2. Is waste separate? Net quantity and waste allowance should be two figures. If they are blended, you do not know what was measured.
  3. Are the exclusions written down? What was left out matters as much as what was counted.

A takeoff costs less than an estimate because there is less work in it. If you price your own work well, there is no reason to pay for someone else's unit costs.

30% off

First job with us? It costs less.

New clients get 30% off their first project with Outlay. You see the fee and the delivery date before any work starts.

Upload plans

More from the blog

New clients

30% off

your first estimate

Upload your plans and we reply with the discounted fee and a delivery date. You decide after that, and you owe nothing if you say no.

Upload plans