An estimate can only be as good as the drawings behind it. Here is what to send, most important first, and what each missing piece costs you.

The drawings

  • The full set, not selected sheets. Scope for one trade is scattered. Flooring appears on the finish plan, the finish schedule, the interior elevations and the details. Send everything and let the estimator pull what applies.
  • The schedules. Door, window, finish, fixture and equipment schedules settle most of the questions that plans alone leave open.
  • PDF with a readable scale. Vector PDF from the design software is best. Scans work if a dimension or a scale bar is legible. Photos of drawings taken at an angle do not.
  • All addenda. An estimate measured from the bid set and not the addenda is an estimate of a different building.

The specifications

Drawings show how much. Specifications say what it is made of. Without them an estimator has to assume a grade of material, and should tell you which. If there is no specification, a list of the products you intend to use does the same job.

What only you know

  • Your scope. The trades you are pricing, and anything you exclude as a matter of course.
  • Your bid date. So the delivery date can be set before work starts, not discovered afterwards.
  • How you want it broken down. By floor, by building, by phase, by unit type. Reorganising a finished takeoff takes far longer than setting it up that way from the start.
  • Your rates and markups, if you want the estimate built on them.
  • Your template, if you want the result in your own spreadsheet.

If something is missing

Send what you have. An estimator can still work, and each gap has a known effect:

  • No structural drawings: foundations and framing are priced from typical construction for the building type, as stated assumptions.
  • No mechanical, electrical or plumbing drawings: those trades are carried as costs per square foot, and the estimate is preliminary for those divisions.
  • No finish schedule: finishes are priced at a stated quality level, and you adjust when selections are made.
  • Sketches only: you get a preliminary estimate, suitable for a budget and not for a bid.

The rule is that every assumption is written beside the number it supports. An estimate with visible assumptions can be corrected. One with hidden assumptions can only be believed or not.

30% off

First job with us? It costs less.

New clients get 30% off their first project with Outlay. You see the fee and the delivery date before any work starts.