Draft copy. Anything with a dashed red underline is a placeholder to confirm before launch.

New clients: 30% off your first estimate

Outlay Sample projects Tilt-up distribution warehouse

Sample project, industrial

Tilt-up distribution warehouse

A distribution warehouse priced end to end: tilt-up panels scheduled one by one, a dock wall, an office pod and the truck courts.

Size
40,000 SF
Construction
Tilt-up concrete panels, steel joists and deck

This one is made up to show how an Outlay estimate is laid out. It is not a client project. Send your own plans for a real one.

Key quantities measured for this sample project
Tilt-up panels38,600 SF
Slab on grade, 6"40,000 SF
Joists and deck40,800 SF
Dock doors and levelers12 EA
Sprinkler heads410 EA
Concrete truck court5,800 SY
Key quantities from the takeoff. Diagram not to scale.

Sheet 2 of 4

The estimate, summarised by division

The first page of the spreadsheet. Behind each division is a section of measured lines, like the ones on our trade pages.

DivisionScopeShare of direct costTotal
03Concrete26.1%1,120,000
05Metals17.7%760,000
07Thermal and moisture protection12.1%520,000
08Openings4.9%210,000
09Finishes3.3%140,000
21Fire suppression4.6%196,000
22Plumbing2.6%110,000
23HVAC4.2%180,000
26Electrical9.8%420,000
31-32Sitework and paving14.9%640,000
Direct cost4,296,000
General conditions, 8%343,680
Overhead and profit, 10%463,968
Estimate total$5,103,648
Cost per square foot$128

Illustrative figures for a sample project, not a quote and not a guide to what your project will cost. Your estimate uses your drawings, your location and your markups.

Sheet 3 of 4

How this one is laid out

In the spreadsheet

  • Panels scheduled one by one, with embeds and reveals
  • Office pod priced as its own section
  • Slab and paving quantities split by thickness
  • Waste factors and markups as separate figures you can change

Trades in this project

30% off

First job with us? It costs less.

New clients get 30% off their first project with Outlay. You see the fee and the delivery date before any work starts.

Upload plans

See the other sample projects, or the sample estimate linked to its plan.

Sheet 4 of 4

Send your plans for a quote

You get an email back with the fee and the delivery date. After that it is your call.

  • No card needed to get a quote
  • Your drawings stay confidential
  • A person reads every request
  • New clients: 30% off your first estimate

    New clients

    30% off

    your first estimate

    Upload your plans and we reply with the discounted fee and a delivery date. You decide after that, and you owe nothing if you say no.

    Upload plans