Outlay Sample projects Residential street and utilities
Sample project, civil
Residential street and utilities
A site contractor's number for a new subdivision street: the earthwork, the paving, and the storm, sanitary and water lines under it.
- Size
- 1,200 LF
- Construction
- Asphalt street with curb, storm, sanitary and water
This one is made up to show how an Outlay estimate is laid out. It is not a client project. Send your own plans for a real one.
| Cut and fill | 6,400 CY |
|---|---|
| Asphalt paving | 4,300 SY |
| Curb and gutter | 2,400 LF |
| Storm pipe | 1,150 LF |
| Sanitary sewer | 1,260 LF |
| Water main | 1,240 LF |
Sheet 2 of 4
The estimate, summarised by division
The first page of the spreadsheet. Behind each division is a section of measured lines, like the ones on our trade pages.
| Division | Scope | Share of direct cost | Total |
|---|---|---|---|
| 31 | Earthwork and erosion control | 21.4% | 210,000 |
| 32 | Paving, curbs and walks | 34.9% | 342,000 |
| 33 | Storm, sanitary and water utilities | 43.7% | 428,000 |
| Direct cost | 980,000 | ||
| General conditions, 8% | 78,400 | ||
| Overhead and profit, 10% | 105,840 | ||
| Estimate total | $1,164,240 | ||
| Cost per linear foot of street | $970 | ||
Illustrative figures for a sample project, not a quote and not a guide to what your project will cost. Your estimate uses your drawings, your location and your markups.
Sheet 3 of 4
How this one is laid out
In the spreadsheet
- Earthwork balanced, with import and export shown
- Pipe measured by size and depth range
- Structures counted by type from the profiles
- Waste factors and markups as separate figures you can change
Trades in this project
30% off
First job with us? It costs less.
New clients get 30% off their first project with Outlay. You see the fee and the delivery date before any work starts.
See the other sample projects, or the sample estimate linked to its plan.
Sheet 4 of 4
Send your plans for a quote
You get an email back with the fee and the delivery date. After that it is your call.
- No card needed to get a quote
- Your drawings stay confidential
- A person reads every request
- New clients: 30% off your first estimate
Plans sent
A person reads every request. If your bid is due soon and you have not heard from us, reply to our email or write to [email protected].