Outlay Sample projects Two-storey custom home
Sample project, residential
Two-storey custom home
What a builder gets when pricing a custom home with us: every trade measured from a 24-sheet architectural and structural set, down to a lumber list ready for the yard.
- Size
- 2,800 SF
- Construction
- Wood frame on a concrete foundation
This one is made up to show how an Outlay estimate is laid out. It is not a client project. Send your own plans for a real one.
| Foundation concrete | 62 CY |
|---|---|
| Framing lumber | 31,400 BF |
| Roofing | 34 SQ |
| Drywall | 11,200 SF |
| Interior doors | 22 EA |
| Flooring, all finishes | 2,650 SF |
Sheet 2 of 4
The estimate, summarised by division
The first page of the spreadsheet. Behind each division is a section of measured lines, like the ones on our trade pages.
| Division | Scope | Share of direct cost | Total |
|---|---|---|---|
| 03 | Concrete | 9.6% | 38,500 |
| 06 | Wood, plastics and composites | 23.9% | 96,000 |
| 07 | Thermal and moisture protection | 10.2% | 41,000 |
| 08 | Openings | 9.1% | 36,500 |
| 09 | Finishes | 21.9% | 88,000 |
| 22 | Plumbing | 7.7% | 31,000 |
| 23 | HVAC | 6.8% | 27,500 |
| 26 | Electrical | 7.3% | 29,500 |
| 31 | Earthwork | 3.5% | 14,000 |
| Direct cost | 402,000 | ||
| General conditions, 8% | 32,160 | ||
| Overhead and profit, 10% | 43,416 | ||
| Estimate total | $477,576 | ||
| Cost per square foot | $171 | ||
Illustrative figures for a sample project, not a quote and not a guide to what your project will cost. Your estimate uses your drawings, your location and your markups.
Sheet 3 of 4
How this one is laid out
In the spreadsheet
- Lumber listed by size and stock length, ready for a yard quote
- Finishes measured room by room against the finish schedule
- Allowances for owner selections shown as separate lines
- Waste factors and markups as separate figures you can change
Trades in this project
30% off
First job with us? It costs less.
New clients get 30% off their first project with Outlay. You see the fee and the delivery date before any work starts.
See the other sample projects, or the sample estimate linked to its plan.
Sheet 4 of 4
Send your plans for a quote
You get an email back with the fee and the delivery date. After that it is your call.
- No card needed to get a quote
- Your drawings stay confidential
- A person reads every request
- New clients: 30% off your first estimate
Plans sent
A person reads every request. If your bid is due soon and you have not heard from us, reply to our email or write to [email protected].