Construction estimating in Texas
Takeoffs and cost estimates for Texas contractors. Slabs on moving clay, Gulf Coast wind scope and tilt-wall panels are measured the way the structural drawings show them, then priced for the zip code of the job.
Nothing to send yet? Ask a question or request a sample.
United StatesTexas project sheet
| Projects in | Houston, Dallas, Austin, San Antonio, and across Texas |
|---|---|
| Units | Imperial: SF, LF, CY, tons |
| Priced in | US dollars |
| Cost data | RSMeans, adjusted to the project zip code, or your own rates |
| Typical delivery | 24 to 48 hours |
- Fee and delivery date
- Confirmed before work starts
- Typical delivery
- 24 to 48 hours
- You receive
- Editable Excel estimate and drawing markups
- Priced from
- Cost data for your zip code
- Minor revisions
- No charge
Sheet 2 of 4
What we watch for on Texas drawings
The same building costs different money in different places, and rates are only part of it. These are the things that change the quantities here.
Expansive clay soils
Much of the state builds on clay that moves. We take off post-tensioned and stiffened slabs, piers and void forms as the structural drawings show them, not as a generic slab.
Gulf Coast wind
Projects near the coast carry windstorm requirements. Roof attachment, strapping and impact-rated openings are measured as their own lines.
Heat and cooling loads
Mechanical scope is a large share of Texas budgets. Equipment is listed by tag and ductwork by weight, so the HVAC number can be checked.
Tilt-wall and big-box work
Warehouses and retail shells are measured by panel, with embeds, reveals, bracing and the casting slab accounted for.
Sheet 3 of 4
Every trade, or just yours
Subcontractors send one trade. General contractors, builders and developers send the whole set. See services for full-scope estimates, preliminary budgets and monthly packages.
- 03Concrete
- 04Masonry
- 05Structural and misc. steel
- 06Lumber and framing
- 07Roofing and waterproofing
- 08Openings
- 09Drywall
- 09Flooring
- 09Interior and exterior finishes
- 21Fire suppression
- 22Plumbing
- 23Mechanical
- 26Electrical
- 31Sitework and earthwork
30% off
First job with us? It costs less.
New clients get 30% off their first project with Outlay. You see the fee and the delivery date before any work starts.
Working somewhere else? See all locations. We take projects from anywhere in the United States, Australia and Canada.
Sheet 4 of 4
Send your plans for a quote
You get an email back with the fee and the delivery date. After that it is your call.
- No card needed to get a quote
- Your drawings stay confidential
- A person reads every request
- New clients: 30% off your first estimate
Plans sent
A person reads every request. If your bid is due soon and you have not heard from us, reply to our email or write to [email protected].