Quantity takeoffs and estimating in Queensland
Quantity takeoffs, bills of quantities and cost estimates for builders and subcontractors in Brisbane and across Queensland, with cyclone tie-downs and raised-house subfloors taken off member by member.
Nothing to send yet? Ask a question or request a sample.
AustraliaQueensland project sheet
| Projects in | Brisbane, Gold Coast, Sunshine Coast, Townsville, and across Queensland |
|---|---|
| Units | Metric: m², m, m³, tonnes |
| Priced in | Australian dollars, GST shown separately |
| Cost data | Your rates and supplier quotes, or current local cost data |
| Typical delivery | 24 to 48 hours |
- Fee and delivery date
- Confirmed before work starts
- Typical delivery
- 24 to 48 hours
- You receive
- Editable Excel estimate and drawing markups
- Priced from
- Cost data for your postcode
- Minor revisions
- No charge
Sheet 2 of 4
What we watch for on Queensland drawings
The same building costs different money in different places, and rates are only part of it. These are the things that change the quantities here.
Cyclone regions
In the north, tie-downs, bracing, roof fixing and rated openings are measured from the structural drawings as their own lines.
Metric bills of quantities
Quantities are measured in metric units and set out by trade.
Elevated and lightweight construction
Steel and timber subfloors, posts and bracing on raised houses are taken off member by member.
GST
Prices are shown excluding GST, with GST as its own line.
Sheet 3 of 4
Every trade, or just yours
Subcontractors send one trade. General contractors, builders and developers send the whole set. See services for full-scope estimates, preliminary budgets and monthly packages.
- 03Concrete
- 04Masonry
- 05Structural and misc. steel
- 06Lumber and framing
- 07Roofing and waterproofing
- 08Openings
- 09Drywall
- 09Flooring
- 09Interior and exterior finishes
- 21Fire suppression
- 22Plumbing
- 23Mechanical
- 26Electrical
- 31Sitework and earthwork
30% off
First job with us? It costs less.
New clients get 30% off their first project with Outlay. You see the fee and the delivery date before any work starts.
Working somewhere else? See all locations. We take projects from anywhere in the United States, Australia and Canada.
Sheet 4 of 4
Send your plans for a quote
You get an email back with the fee and the delivery date. After that it is your call.
- No card needed to get a quote
- Your drawings stay confidential
- A person reads every request
- New clients: 30% off your first estimate
Plans sent
A person reads every request. If your bid is due soon and you have not heard from us, reply to our email or write to [email protected].