Construction estimating in California
Takeoffs and cost estimates for California projects. The seismic hardware, Title 24 items and wildfire-zone materials on your drawings are counted one by one, where a square-foot allowance would miss them.
Nothing to send yet? Ask a question or request a sample.
United StatesCalifornia project sheet
| Projects in | Los Angeles, San Diego, San Francisco, Sacramento, and across California |
|---|---|
| Units | Imperial: SF, LF, CY, tons |
| Priced in | US dollars |
| Cost data | RSMeans, adjusted to the project zip code, or your own rates |
| Typical delivery | 24 to 48 hours |
- Fee and delivery date
- Confirmed before work starts
- Typical delivery
- 24 to 48 hours
- You receive
- Editable Excel estimate and drawing markups
- Priced from
- Cost data for your zip code
- Minor revisions
- No charge
Sheet 2 of 4
What we watch for on California drawings
The same building costs different money in different places, and rates are only part of it. These are the things that change the quantities here.
Seismic detailing
Hold-downs, straps, shear wall nailing, moment frames and extra reinforcing are counted from the structural sheets, where a square-foot allowance would miss them.
Title 24 energy requirements
Insulation, glazing performance, lighting controls and mechanical efficiency called for on the energy sheets are carried into the takeoff.
Wildfire zones
Where the project sits in a wildland-urban interface area, ignition-resistant siding, vents, decking and roofing are taken off as specified.
Prevailing wage
Public works are priced at the prevailing wage determinations you give us for the project, shown as their own labor rates.
Sheet 3 of 4
Every trade, or just yours
Subcontractors send one trade. General contractors, builders and developers send the whole set. See services for full-scope estimates, preliminary budgets and monthly packages.
- 03Concrete
- 04Masonry
- 05Structural and misc. steel
- 06Lumber and framing
- 07Roofing and waterproofing
- 08Openings
- 09Drywall
- 09Flooring
- 09Interior and exterior finishes
- 21Fire suppression
- 22Plumbing
- 23Mechanical
- 26Electrical
- 31Sitework and earthwork
30% off
First job with us? It costs less.
New clients get 30% off their first project with Outlay. You see the fee and the delivery date before any work starts.
Working somewhere else? See all locations. We take projects from anywhere in the United States, Australia and Canada.
Sheet 4 of 4
Send your plans for a quote
You get an email back with the fee and the delivery date. After that it is your call.
- No card needed to get a quote
- Your drawings stay confidential
- A person reads every request
- New clients: 30% off your first estimate
Plans sent
A person reads every request. If your bid is due soon and you have not heard from us, reply to our email or write to [email protected].