Draft copy. Anything with a dashed red underline is a placeholder to confirm before launch.

New clients: 30% off your first estimate

Outlay Locations California

Construction estimating in California

Takeoffs and cost estimates for California projects. The seismic hardware, Title 24 items and wildfire-zone materials on your drawings are counted one by one, where a square-foot allowance would miss them.

Nothing to send yet? Ask a question or request a sample.

United StatesCalifornia project sheet

How Outlay prepares estimates for California
Projects inLos Angeles, San Diego, San Francisco, Sacramento, and across California
UnitsImperial: SF, LF, CY, tons
Priced inUS dollars
Cost dataRSMeans, adjusted to the project zip code, or your own rates
Typical delivery24 to 48 hours
We work remotely from your drawings. No site visit is needed.
Fee and delivery date
Confirmed before work starts
Typical delivery
24 to 48 hours
You receive
Editable Excel estimate and drawing markups
Priced from
Cost data for your zip code
Minor revisions
No charge

Sheet 2 of 4

What we watch for on California drawings

The same building costs different money in different places, and rates are only part of it. These are the things that change the quantities here.

  1. Seismic detailing

    Hold-downs, straps, shear wall nailing, moment frames and extra reinforcing are counted from the structural sheets, where a square-foot allowance would miss them.

  2. Title 24 energy requirements

    Insulation, glazing performance, lighting controls and mechanical efficiency called for on the energy sheets are carried into the takeoff.

  3. Wildfire zones

    Where the project sits in a wildland-urban interface area, ignition-resistant siding, vents, decking and roofing are taken off as specified.

  4. Prevailing wage

    Public works are priced at the prevailing wage determinations you give us for the project, shown as their own labor rates.

Sheet 3 of 4

Every trade, or just yours

Subcontractors send one trade. General contractors, builders and developers send the whole set. See services for full-scope estimates, preliminary budgets and monthly packages.

30% off

First job with us? It costs less.

New clients get 30% off their first project with Outlay. You see the fee and the delivery date before any work starts.

Upload plans

Working somewhere else? See all locations. We take projects from anywhere in the United States, Australia and Canada.

Sheet 4 of 4

Send your plans for a quote

You get an email back with the fee and the delivery date. After that it is your call.

  • No card needed to get a quote
  • Your drawings stay confidential
  • A person reads every request
  • New clients: 30% off your first estimate

    New clients

    30% off

    your first estimate

    Upload your plans and we reply with the discounted fee and a delivery date. You decide after that, and you owe nothing if you say no.

    Upload plans